WanderVerse
WanderBand · decisions

Why this way.

Every meaningful decision in this product, the rationale, and the alternatives we rejected. If you disagree, we want to hear about it.

← Back to product page

WanderBand Family — Decision Log

Running log of every keep/swap/drop decision. Citations per entry.

---

Stage 0 — Feature-parity sweep (2026-04-24)

Stage 1 — Intake + freeze (2026-04-24)

Stage 2 — Component selection (2026-04-24, Perplexity-validated)

Dual-SoC architecture confirmed (not single-SoC, corrected via Perplexity 2026-04-24):

Cellular modem (Pro/Ultra): Telit FN990Axx primary (Perplexity-validated — explicit AT&T + FirstNet + T-Mobile + Verizon cert). Quectel BG95-M3 alternate for ultra-compact form factor optimization. Sequans Monarch 2 tertiary.

WiFi client radio: on Standard+, integrated WiFi 6/6E via Ambiq/Nordic reference designs + MediaTek MT7925 alternate module path.

Sensor puck v1 components locked:

Sensor puck v1.5 additions (Pro+):

Sensor puck v2 (Ultra 2028+, Pro 2028 upgrade):

Chassis materials:

Battery:

Display:

Stage 2b — Configurator axes (2026-04-24)

15 axes per tier including case size, cover material/finish, strap, sensor-puck tier, cellular option (Pro+), mmWave option (Pro+), dual-display (Ultra only), ambassador signature tier. See CONFIGURATOR.md.

Stage 3 — Compatibility review (2026-04-24)

Resolved:

Deferred:

Stage 4 — Sourcing (2026-04-24, Perplexity-framed)

Same pattern as Bridge Mini: distributor RFQs needed for all components but framework is solid. Telit FN990Axx primary cellular; live RFQ pending. See SOURCING.csv.

Stage 5 — DFM/DFA/DFT (2026-04-24)

Stage 6 — Thermal/EMC (2026-04-24)

Stage 7 — Compliance (2026-04-24)

Stage 8 — Canonical BOM + GUIDE + STLs (2026-04-24)

Platform + modules + 15 STL files (strap variants, charging dock, repair tools, display frame). See BOM-platform.csv, BOM-modules.csv, GUIDE.md, STL-OPEN-FILES/README.md.

Stage 9 — HW↔FW binding (2026-04-24)

Stage 10 — Gate review + service flow (2026-04-24)

---

Critical open items (revalidated)

ItemSeverityAction ownerDeadline
Rockley glucose partnership🟡Michaelbefore Ultra tape-out 2027-Q2
NTN satellite SOS partner🔴Michael2026-Q3 outreach, 2027-Q1 commitment
MNO eSIM partnership🔴Michael2027-Q2
Academic HRT research partner🟡Michael2027-Q1
FDA pre-sub filing🟡Michael2027-Q2
Contract manufacturer (wearable-class SMT)🔴Michael2027-Q1
Engineering team hire (EE + FW + industrial design)🔴Michael**NOW — 2026-Q3 start**