Every meaningful decision in this product, the rationale, and the alternatives we rejected. If you disagree, we want to hear about it.
Running log of every keep/swap/drop decision across Cam + Bell + Lock. Citations per entry.
---
_COMPETITIVE-AUDIT-2026-04-24.md). 4 of 6 LAGS are business-model positioning choices (price, retail channel, pro-install network, face-rec-on-lock), not capability gaps.---
_MANIFEST.md).v1.0-candidate.---
---
WANDERGUARD-BUILD-SPEC.md priced Cam Outdoor $149, Cam Indoor $99, Bell $129, Lock $199, Starter Kit $299, Full Kit $499.WANDERGUARD-BUILD-SPEC.md precedent.---
WANDERGUARD-BUILD-SPEC.md assumed all detection on Hub Frigate + optional Coral USB TPU.---
---
Each product has a discrete configurator axis set. See CONFIGURATOR.md:
---
Resolved:
Deferred to Stage 5/6:
---
Same pattern as WanderBand:
See SOURCING.csv for per-part detail.
---
---
---
---
BOM-platform.csv, BOM-modules.csv, GUIDE.md, STL-OPEN-FILES/README.md---
HW-FW.md---
GATE.md)---
| Item | Severity | Action owner | Deadline |
|---|---|---|---|
| Engineering team hire (EE + FW + ID) shared pool with WanderRouter + WanderBand | 🔴 | Michael | **NOW — 2026-Q3 start** |
| Contract manufacturer for outdoor-rated camera SMT + lock mechanical + doorbell sheet-metal/plastic | 🔴 | Michael + ops | 2026-Q3 |
| Sony IMX FAE / NDA (IMX415 + IMX678 volume pricing) | 🟡 | engineering hire | 2026-Q4 |
| Bosch ISP license (Cam Pro HDR) | 🟡 | engineering hire | 2026-Q4 |
| Rockchip RK3566 BSP + NPU toolchain | 🟡 | engineering hire | 2027-Q1 |
| UL 437 cert lab engagement | 🟡 | cert team | 2027-Q2 |
| BHMA Grade 1 test fixture (250k unlock cycles) | 🟡 | Lock engineering | 2027-Q1 |
| Matter CSA membership + test-fixture access | 🟡 | firmware | 2027-Q1 |
| Goodix GM165 fingerprint FAE + NDA | 🟡 | engineering hire | 2027-Q2 |
| WanderStore safety-review pipeline (detection models) | 🟡 | WanderStore team | 2027-Q3 |
| Ambassador training curriculum extension | 🟡 | WWP ops | 2027-Q1 |
| Live KiCad + Flux.ai schematics for 7 unique PCBAs | 🔴 | engineering team | 2027-Q1 |
| State-specific privacy labeling + setup flow | 🟢 | firmware + packaging | 2027-Q1 |
---