Why this way.

Every meaningful decision in this product, the rationale, and the alternatives we rejected. If you disagree, we want to hear about it.

← Back to product page

WanderBridge Mini — Decision Log

Running log of every keep/swap/drop decision through Stages 0–10. Each entry cites source (Perplexity call, datasheet, distributor page, design research) and dates the call.

---

Stage 0 — Feature-parity sweep (2026-04-24)

Stage 1 — Intake + freeze (2026-04-24)

Stage 2 — Component selection (2026-04-24)

40 components selected — 21 platform (in every unit), 19 module (configurable or upgrade). Full BOM at BOM-normalized.csv.

Key architectural decisions:

SoC: MediaTek MT7981B (Filogic 820)

Mini chassis RAM/storage constraint (Standard 2 deviation)

Internal switch vs external switch chip

PoE-PD: TPS2373 (802.3at) base, TPS23881 (802.3bt) upgrade

Multi-backhaul = daughterboards (not on main PCB)

Enclosure — 3 cover tiers, 1 base

Ambassador signature — two tiers

---

Flags carried into Stage 3:

#FlagSeverityStage-3 action
1MT7981B PCIe 2.0 vs MT7925 PCIe 2.0 compatibility🟢datasheet cross-check (standard PCIe handshake)
2MoCA + WiFi antenna coexistence — possible 2.4 GHz interference🟡Stage 6 EMC/co-existence test plan
3Powerline AC line + SoC ground isolation — Y-cap + ferrite placement🟡Stage 6 EMC design pre-check
42nd-port daughterboard 30-pin header pinout definition🟢Stage 5 DFA — settle pinout early so daughterboards can standardize
5MT7925 FCC modular cert status (April 2026)🟡Stage 7 compliance + Stage 4 Perplexity verification
6PoE-bt inrush current vs chassis thermal under 60W ceiling🟡Stage 6 thermal model
7Die-cast vs CNC-from-billet vs sheet-metal — chassis volume production path🟡Stage 5/6 tooling + supplier conversation
82.5G RJ45 shielded magnetics + chassis ground strategy🟢standard EMC practice; cover in Stage 6
9Production origin — US contract-mfg (e.g. Arrow SMT NC) vs Taiwan (Foxconn, Qisda)🔴Stage 7 compliance + business-decision, gates before EVT
10Anodization spec for Pro covers (MIL-A-8625 Type II or III?)🟢Stage 5/6 mechanical sign-off
11Powerline + UL certification (mains-connected product)🟡Stage 7 compliance — UL 62368-1 pre-cert lab quote
12Open STL file coverage — which parts get published🟢Stage 8 — confirm: Standard cover (yes), Pro cover (yes, with copyright), Lux (no — by design, Artisan-made only)

Stage 2b — Configurator axes (pending)

_(7 axes identified in MANIFEST; full matrix to follow)_

Stage 3 — Compatibility review (2026-04-24)

40-part BOM verified electrically + mechanically coherent. Full output: COMPATIBILITY.md.

Resolved in this stage:

Deferred / open:

Stage-4 Perplexity queries queued for tomorrow: 1. MT7981B + MT7925 distributor stock/lead-time/lifecycle 2. MxL3710 + MT7510P supply status 3. MT7925 FCC modular cert confirmation 4. UL 62368-1 pre-cert lab quotes for Powerline 5. US vs Taiwan CM supplier comparison at 1k-10k unit scale

Stage 4 — Sourcing (pending, Perplexity rounds reset)

Stage 5 — DFM/DFA/DFT (2026-04-24)

Full output: DFM-DFA-DFT.md.

Key decisions:

Stage 6 — Thermal/EMC/ESD (2026-04-24)

Full output: THERMAL-EMC.md.

Key decisions:

Decisions locked 2026-04-24 (Michael deferred, Claude decided):

1. Powerline → deferred to v2. Bridge Mini v1 backhaul menu: Ethernet / MoCA 2.5 / WiFi 7 client radio. Removes MT7510P, MT7510P transformer, IEC C7 inlet, UL 62368-1 cert cost from v1 BOM/timeline. Saves $18-35k + 3-6 months. Still 3 configurable backhaul paths.

2. Chassis → single variant. No Mini-Powerline chassis extension needed. Single STL family + single tooling path.

BOM-normalized.csv trimming (Powerline-related rows removed from v1 scope — rows 27, 28, 29 now marked deferred-to-v2):

Rows remain in BOM-normalized.csv for posterity + v2 planning, flagged in stage2_notes.

Updated Bridge Mini v1 BOM: 37 active parts (40 total, 3 Powerline deferred).

Stage 7 — Compliance (pending — production origin is 🔴)

Stage 8 — Canonical BOM + GUIDE + STLs (pending)

Stage 9 — HW↔FW binding (pending)

Stage 10 — Gate review + configurator UI + service flow (pending)